<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Planning NAC on Edge Switch in Network Access Control</title>
    <link>https://community.cisco.com/t5/network-access-control/planning-nac-on-edge-switch/m-p/4114990#M561557</link>
    <description>&lt;P&gt;&lt;A href="https://www.cisco.com/c/en/us/products/collateral/security/identity-services-engine/bulletin-c25-743180.html" data-id="link20" target="_blank"&gt;Cisco Identity Services Engine Software Version 2.2/2.2.1 Product Bulletin&lt;/A&gt; &lt;SPAN class=""&gt;&amp;nbsp;&lt;/SPAN&gt;&lt;/P&gt;
&lt;P&gt;is showing that ISE 2.2 has reached the end of software maintenance. Please plan an upgrade to later ISE releases at the earliest.&lt;/P&gt;</description>
    <pubDate>Wed, 08 Jul 2020 01:54:27 GMT</pubDate>
    <dc:creator>hslai</dc:creator>
    <dc:date>2020-07-08T01:54:27Z</dc:date>
    <item>
      <title>Planning NAC on Edge Switch</title>
      <link>https://community.cisco.com/t5/network-access-control/planning-nac-on-edge-switch/m-p/4113793#M561529</link>
      <description>&lt;P&gt;Hi&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I've been tasked to look at NAC for a large customer.&amp;nbsp; Currently running 600 edge switch stacks over multiple sites, each switch stack is split in to a /25.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I have been playing around with a config before lock down, monitoring on a&amp;nbsp;lab switch on site, plugging in&amp;nbsp;different types of equipment.&lt;/P&gt;&lt;P&gt;I've created different Endpoint Groups for different types of equipment, I'm just wondering if there is a better way?&lt;/P&gt;&lt;P&gt;Currently running 2.2.&lt;/P&gt;&lt;P&gt;Also need to look at scaling up the current nodes, as was built on VM using 1.2 spec.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;cheers&lt;/P&gt;</description>
      <pubDate>Mon, 06 Jul 2020 08:46:32 GMT</pubDate>
      <guid>https://community.cisco.com/t5/network-access-control/planning-nac-on-edge-switch/m-p/4113793#M561529</guid>
      <dc:creator>craiglebutt</dc:creator>
      <dc:date>2020-07-06T08:46:32Z</dc:date>
    </item>
    <item>
      <title>Re: Planning NAC on Edge Switch</title>
      <link>https://community.cisco.com/t5/network-access-control/planning-nac-on-edge-switch/m-p/4114989#M561556</link>
      <description>&lt;P&gt;You have a good start. Please review the following info:&lt;/P&gt;
&lt;UL&gt;
&lt;LI&gt;&lt;A href="https://community.cisco.com/t5/security-documents/ise-planning-amp-pre-deployment-checklists/ta-p/3622635" target="_blank" rel="noopener"&gt;ISE Planning &amp;amp; Pre-Deployment Checklists&lt;/A&gt;&lt;/LI&gt;
&lt;LI&gt;&lt;A href="http://cs.co/ise-cx" target="_blank"&gt;http://cs.co/ise-cx&lt;/A&gt;&lt;/LI&gt;
&lt;/UL&gt;</description>
      <pubDate>Wed, 08 Jul 2020 01:46:46 GMT</pubDate>
      <guid>https://community.cisco.com/t5/network-access-control/planning-nac-on-edge-switch/m-p/4114989#M561556</guid>
      <dc:creator>hslai</dc:creator>
      <dc:date>2020-07-08T01:46:46Z</dc:date>
    </item>
    <item>
      <title>Re: Planning NAC on Edge Switch</title>
      <link>https://community.cisco.com/t5/network-access-control/planning-nac-on-edge-switch/m-p/4114990#M561557</link>
      <description>&lt;P&gt;&lt;A href="https://www.cisco.com/c/en/us/products/collateral/security/identity-services-engine/bulletin-c25-743180.html" data-id="link20" target="_blank"&gt;Cisco Identity Services Engine Software Version 2.2/2.2.1 Product Bulletin&lt;/A&gt; &lt;SPAN class=""&gt;&amp;nbsp;&lt;/SPAN&gt;&lt;/P&gt;
&lt;P&gt;is showing that ISE 2.2 has reached the end of software maintenance. Please plan an upgrade to later ISE releases at the earliest.&lt;/P&gt;</description>
      <pubDate>Wed, 08 Jul 2020 01:54:27 GMT</pubDate>
      <guid>https://community.cisco.com/t5/network-access-control/planning-nac-on-edge-switch/m-p/4114990#M561557</guid>
      <dc:creator>hslai</dc:creator>
      <dc:date>2020-07-08T01:54:27Z</dc:date>
    </item>
  </channel>
</rss>

