<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Changing logical name - Impact on Sub-interface- FTD in Network Security</title>
    <link>https://community.cisco.com/t5/network-security/changing-logical-name-impact-on-sub-interface-ftd/m-p/5297692#M1121277</link>
    <description>&lt;P&gt;Dear All,&lt;/P&gt;&lt;P&gt;I was trying to add a logical name to one of our internet faced physical interface to bring it to high availablity monitoring. But we have a sub-interface under this physical interface which is the actual internet logical interface with IP configured. Since I want only the physical interface to get monitored and don't want to have the logical IP-sub-interface for monitoring I did this.&lt;/P&gt;&lt;P&gt;But before deploying I want to make sure this won't impact the logical sub-interface connectivity or do I need to do this with maintainance window. Since there are many challenges to get a maintainance window I would need to check if this change doesn't interrupts or disconnects if we push it during production.&lt;/P&gt;&lt;P&gt;Does changing the logical name of a physical interface have any disconnections on the sub-interface..? can anyone confirm pls.&lt;/P&gt;&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="titusroz03_0-1749448008251.png" style="width: 400px;"&gt;&lt;img src="https://community.cisco.com/t5/image/serverpage/image-id/246148iFDE46C461090F23F/image-size/medium?v=v2&amp;amp;px=400" role="button" title="titusroz03_0-1749448008251.png" alt="titusroz03_0-1749448008251.png" /&gt;&lt;/span&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
    <pubDate>Mon, 09 Jun 2025 05:48:18 GMT</pubDate>
    <dc:creator>titusroz03</dc:creator>
    <dc:date>2025-06-09T05:48:18Z</dc:date>
    <item>
      <title>Changing logical name - Impact on Sub-interface- FTD</title>
      <link>https://community.cisco.com/t5/network-security/changing-logical-name-impact-on-sub-interface-ftd/m-p/5297692#M1121277</link>
      <description>&lt;P&gt;Dear All,&lt;/P&gt;&lt;P&gt;I was trying to add a logical name to one of our internet faced physical interface to bring it to high availablity monitoring. But we have a sub-interface under this physical interface which is the actual internet logical interface with IP configured. Since I want only the physical interface to get monitored and don't want to have the logical IP-sub-interface for monitoring I did this.&lt;/P&gt;&lt;P&gt;But before deploying I want to make sure this won't impact the logical sub-interface connectivity or do I need to do this with maintainance window. Since there are many challenges to get a maintainance window I would need to check if this change doesn't interrupts or disconnects if we push it during production.&lt;/P&gt;&lt;P&gt;Does changing the logical name of a physical interface have any disconnections on the sub-interface..? can anyone confirm pls.&lt;/P&gt;&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="titusroz03_0-1749448008251.png" style="width: 400px;"&gt;&lt;img src="https://community.cisco.com/t5/image/serverpage/image-id/246148iFDE46C461090F23F/image-size/medium?v=v2&amp;amp;px=400" role="button" title="titusroz03_0-1749448008251.png" alt="titusroz03_0-1749448008251.png" /&gt;&lt;/span&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Mon, 09 Jun 2025 05:48:18 GMT</pubDate>
      <guid>https://community.cisco.com/t5/network-security/changing-logical-name-impact-on-sub-interface-ftd/m-p/5297692#M1121277</guid>
      <dc:creator>titusroz03</dc:creator>
      <dc:date>2025-06-09T05:48:18Z</dc:date>
    </item>
  </channel>
</rss>

