<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Fabric in a Box initial configuration in Software-Defined Access (SD-Access)</title>
    <link>https://community.cisco.com/t5/software-defined-access-sd-access/fabric-in-a-box-initial-configuration/m-p/5289036#M4046</link>
    <description>&lt;P&gt;&amp;nbsp;Hello,&lt;BR /&gt;&lt;BR /&gt;&lt;/P&gt;
&lt;P class="" data-start="111" data-end="282"&gt;I would like to ask what is the required configuration&amp;nbsp; for deploying a switch in Fabric-in-a-Box (FIAB) mode (just one stack of two switches, with no downlinks connected).&lt;/P&gt;
&lt;P class="" data-start="284" data-end="477"&gt;I see that, in order to declare it as CP/BN/Edge in the Fabric Site Catalyst Center GUI, the only requirement is that the Loopback0 interface is created with an IP address and reachable by Catalyst Center.&lt;/P&gt;
&lt;P class="" data-start="479" data-end="615"&gt;Once that’s done, Catalyst Center automatically deploys the full configuration, and the switch is assigned all three roles (CP/BN/Edge).&lt;/P&gt;
&lt;P class="" data-start="617" data-end="857"&gt;From what I understand, there’s no need to manually configure anything else beyond what I mentioned. However, I’ve noticed that a standalone FIAB switch using the Loopback0 IP doesn’t seem to have IS-IS declared, nor is the MTU set to 1492.&lt;/P&gt;
&lt;P class="" data-start="859" data-end="876"&gt;Is this correct?&lt;/P&gt;
&lt;P class="" data-start="878" data-end="885"&gt;Thanks!&lt;/P&gt;</description>
    <pubDate>Thu, 08 May 2025 11:48:07 GMT</pubDate>
    <dc:creator>Se1r</dc:creator>
    <dc:date>2025-05-08T11:48:07Z</dc:date>
    <item>
      <title>Fabric in a Box initial configuration</title>
      <link>https://community.cisco.com/t5/software-defined-access-sd-access/fabric-in-a-box-initial-configuration/m-p/5289036#M4046</link>
      <description>&lt;P&gt;&amp;nbsp;Hello,&lt;BR /&gt;&lt;BR /&gt;&lt;/P&gt;
&lt;P class="" data-start="111" data-end="282"&gt;I would like to ask what is the required configuration&amp;nbsp; for deploying a switch in Fabric-in-a-Box (FIAB) mode (just one stack of two switches, with no downlinks connected).&lt;/P&gt;
&lt;P class="" data-start="284" data-end="477"&gt;I see that, in order to declare it as CP/BN/Edge in the Fabric Site Catalyst Center GUI, the only requirement is that the Loopback0 interface is created with an IP address and reachable by Catalyst Center.&lt;/P&gt;
&lt;P class="" data-start="479" data-end="615"&gt;Once that’s done, Catalyst Center automatically deploys the full configuration, and the switch is assigned all three roles (CP/BN/Edge).&lt;/P&gt;
&lt;P class="" data-start="617" data-end="857"&gt;From what I understand, there’s no need to manually configure anything else beyond what I mentioned. However, I’ve noticed that a standalone FIAB switch using the Loopback0 IP doesn’t seem to have IS-IS declared, nor is the MTU set to 1492.&lt;/P&gt;
&lt;P class="" data-start="859" data-end="876"&gt;Is this correct?&lt;/P&gt;
&lt;P class="" data-start="878" data-end="885"&gt;Thanks!&lt;/P&gt;</description>
      <pubDate>Thu, 08 May 2025 11:48:07 GMT</pubDate>
      <guid>https://community.cisco.com/t5/software-defined-access-sd-access/fabric-in-a-box-initial-configuration/m-p/5289036#M4046</guid>
      <dc:creator>Se1r</dc:creator>
      <dc:date>2025-05-08T11:48:07Z</dc:date>
    </item>
    <item>
      <title>Re: Fabric in a Box initial configuration</title>
      <link>https://community.cisco.com/t5/software-defined-access-sd-access/fabric-in-a-box-initial-configuration/m-p/5289039#M4047</link>
      <description>&lt;P&gt;answer to your Q is: IS-IS (basically whatever IGP) is not needed until there is &amp;gt;1 node in the Fabric.&lt;BR /&gt;IS-IS will be automatically configured when u LAN-A your ENs.&lt;BR /&gt;Keep in mind on BN you have to configure L3-handoff. There are some caveats: f.e. u cannot automate l3-handoff in the same VLAN to peer with 2 FNs which otherwise would be usual practice for CPE to peer with 2 PEs.&lt;/P&gt;</description>
      <pubDate>Thu, 08 May 2025 12:08:18 GMT</pubDate>
      <guid>https://community.cisco.com/t5/software-defined-access-sd-access/fabric-in-a-box-initial-configuration/m-p/5289039#M4047</guid>
      <dc:creator>Andrii Oliinyk</dc:creator>
      <dc:date>2025-05-08T12:08:18Z</dc:date>
    </item>
  </channel>
</rss>

