<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic PnP not deploying complete switch configuration in Controllers</title>
    <link>https://community.cisco.com/t5/controllers/pnp-not-deploying-complete-switch-configuration/m-p/3598144#M1183</link>
    <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;I need some advice or assistance to get PnP to deploy a complete switch stack configuration at the same times as I do a image upgrade.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;I'm struggling getting the APIC-EM PnP to work as expected deploying the complete switch (WS-C3650-48PD) configuration. I've pre-provisioned switches to upgrade image to IOS-XE 16.3.3 and deploy a switch stack configuration where only the image is upgraded and the first half of the configuration is deployed. The odd thing is that PnP seems to think it is a success and says status Provisioned.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;When I deploy the same configuration via CLI or do a new provision of the same switch stack but without image upgrade the complete configuration goes through without any errors so I assume the configuration is correct. I see no timeouts and we use 40 minutes timeout for image upgrade and 30 minutes for configuration deployment.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;I have the same behavior on all switch stacks that the configuration deployment only deploy the interface configuration for the first two switches in the stack.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;The interface configuration used is the following.&lt;/P&gt;&lt;P&gt;interface range GigabitEthernet2/0/1 - 48&lt;/P&gt;&lt;P&gt; switchport access vlan 42&lt;/P&gt;&lt;P&gt; switchport mode access&lt;/P&gt;&lt;P&gt; spanning-tree portfast&lt;/P&gt;&lt;P&gt; authentication control-direction in&lt;/P&gt;&lt;P&gt; authentication event fail action auth vlan 42&lt;/P&gt;&lt;P&gt; authentication event server dead action authorize vlan 42&lt;/P&gt;&lt;P&gt; authentication event no-response action authorize vlan 42&lt;/P&gt;&lt;P&gt; authentication event server alive action reinitialize &lt;/P&gt;&lt;P&gt; authentication host-mode multi-domain&lt;/P&gt;&lt;P&gt; authentication order dot1x mab&lt;/P&gt;&lt;P&gt; authentication priority dot1x mab&lt;/P&gt;&lt;P&gt; authentication port-control auto&lt;/P&gt;&lt;P&gt; authentication periodic&lt;/P&gt;&lt;P&gt; authentication timer reauthenticate server&lt;/P&gt;&lt;P&gt; mab&lt;/P&gt;&lt;P&gt; dot1x pae authenticator&lt;/P&gt;&lt;P&gt; dot1x timeout tx-period 3&lt;/P&gt;&lt;P&gt; dot1x timeout supp-timeout 10&lt;/P&gt;&lt;P&gt; dot1x max-req 3&lt;/P&gt;&lt;P&gt; spanning-tree bpduguard enable&lt;/P&gt;&lt;P&gt; switchport nonegotiate&lt;/P&gt;&lt;P&gt; storm-control broadcast level 0.5&lt;/P&gt;&lt;P&gt; storm-control multicast level 10&lt;/P&gt;&lt;P&gt;exit&lt;/P&gt;&lt;P&gt;!&lt;/P&gt;&lt;P&gt;interface range GigabitEthernet3/0/1 - 48&lt;/P&gt;&lt;P&gt; switchport access vlan 42&lt;/P&gt;&lt;P&gt; switchport mode access&lt;/P&gt;&lt;P&gt; spanning-tree portfast&lt;/P&gt;&lt;P&gt; authentication control-direction in&lt;/P&gt;&lt;P&gt; authentication event fail action auth vlan 42&lt;/P&gt;&lt;P&gt; authentication event server dead action authorize vlan 42&lt;/P&gt;&lt;P&gt; authentication event no-response action authorize vlan 42&lt;/P&gt;&lt;P&gt; authentication event server alive action reinitialize &lt;/P&gt;&lt;P&gt; authentication host-mode multi-domain&lt;/P&gt;&lt;P&gt; authentication order dot1x mab&lt;/P&gt;&lt;P&gt; authentication priority dot1x mab&lt;/P&gt;&lt;P&gt; authentication port-control auto&lt;/P&gt;&lt;P&gt; authentication periodic&lt;/P&gt;&lt;P&gt; authentication timer reauthenticate server&lt;/P&gt;&lt;P&gt; mab&lt;/P&gt;&lt;P&gt; dot1x pae authenticator&lt;/P&gt;&lt;P&gt; dot1x timeout tx-period 3&lt;/P&gt;&lt;P&gt; dot1x timeout supp-timeout 10&lt;/P&gt;&lt;P&gt; dot1x max-req 3&lt;/P&gt;&lt;P&gt; spanning-tree bpduguard enable&lt;/P&gt;&lt;P&gt; switchport nonegotiate&lt;/P&gt;&lt;P&gt; storm-control broadcast level 0.5&lt;/P&gt;&lt;P&gt; storm-control multicast level 10&lt;/P&gt;&lt;P&gt;exit&lt;/P&gt;&lt;P&gt;!&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
    <pubDate>Fri, 01 Mar 2019 12:41:15 GMT</pubDate>
    <dc:creator>Joakim Backlund</dc:creator>
    <dc:date>2019-03-01T12:41:15Z</dc:date>
    <item>
      <title>PnP not deploying complete switch configuration</title>
      <link>https://community.cisco.com/t5/controllers/pnp-not-deploying-complete-switch-configuration/m-p/3598144#M1183</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;I need some advice or assistance to get PnP to deploy a complete switch stack configuration at the same times as I do a image upgrade.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;I'm struggling getting the APIC-EM PnP to work as expected deploying the complete switch (WS-C3650-48PD) configuration. I've pre-provisioned switches to upgrade image to IOS-XE 16.3.3 and deploy a switch stack configuration where only the image is upgraded and the first half of the configuration is deployed. The odd thing is that PnP seems to think it is a success and says status Provisioned.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;When I deploy the same configuration via CLI or do a new provision of the same switch stack but without image upgrade the complete configuration goes through without any errors so I assume the configuration is correct. I see no timeouts and we use 40 minutes timeout for image upgrade and 30 minutes for configuration deployment.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;I have the same behavior on all switch stacks that the configuration deployment only deploy the interface configuration for the first two switches in the stack.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;The interface configuration used is the following.&lt;/P&gt;&lt;P&gt;interface range GigabitEthernet2/0/1 - 48&lt;/P&gt;&lt;P&gt; switchport access vlan 42&lt;/P&gt;&lt;P&gt; switchport mode access&lt;/P&gt;&lt;P&gt; spanning-tree portfast&lt;/P&gt;&lt;P&gt; authentication control-direction in&lt;/P&gt;&lt;P&gt; authentication event fail action auth vlan 42&lt;/P&gt;&lt;P&gt; authentication event server dead action authorize vlan 42&lt;/P&gt;&lt;P&gt; authentication event no-response action authorize vlan 42&lt;/P&gt;&lt;P&gt; authentication event server alive action reinitialize &lt;/P&gt;&lt;P&gt; authentication host-mode multi-domain&lt;/P&gt;&lt;P&gt; authentication order dot1x mab&lt;/P&gt;&lt;P&gt; authentication priority dot1x mab&lt;/P&gt;&lt;P&gt; authentication port-control auto&lt;/P&gt;&lt;P&gt; authentication periodic&lt;/P&gt;&lt;P&gt; authentication timer reauthenticate server&lt;/P&gt;&lt;P&gt; mab&lt;/P&gt;&lt;P&gt; dot1x pae authenticator&lt;/P&gt;&lt;P&gt; dot1x timeout tx-period 3&lt;/P&gt;&lt;P&gt; dot1x timeout supp-timeout 10&lt;/P&gt;&lt;P&gt; dot1x max-req 3&lt;/P&gt;&lt;P&gt; spanning-tree bpduguard enable&lt;/P&gt;&lt;P&gt; switchport nonegotiate&lt;/P&gt;&lt;P&gt; storm-control broadcast level 0.5&lt;/P&gt;&lt;P&gt; storm-control multicast level 10&lt;/P&gt;&lt;P&gt;exit&lt;/P&gt;&lt;P&gt;!&lt;/P&gt;&lt;P&gt;interface range GigabitEthernet3/0/1 - 48&lt;/P&gt;&lt;P&gt; switchport access vlan 42&lt;/P&gt;&lt;P&gt; switchport mode access&lt;/P&gt;&lt;P&gt; spanning-tree portfast&lt;/P&gt;&lt;P&gt; authentication control-direction in&lt;/P&gt;&lt;P&gt; authentication event fail action auth vlan 42&lt;/P&gt;&lt;P&gt; authentication event server dead action authorize vlan 42&lt;/P&gt;&lt;P&gt; authentication event no-response action authorize vlan 42&lt;/P&gt;&lt;P&gt; authentication event server alive action reinitialize &lt;/P&gt;&lt;P&gt; authentication host-mode multi-domain&lt;/P&gt;&lt;P&gt; authentication order dot1x mab&lt;/P&gt;&lt;P&gt; authentication priority dot1x mab&lt;/P&gt;&lt;P&gt; authentication port-control auto&lt;/P&gt;&lt;P&gt; authentication periodic&lt;/P&gt;&lt;P&gt; authentication timer reauthenticate server&lt;/P&gt;&lt;P&gt; mab&lt;/P&gt;&lt;P&gt; dot1x pae authenticator&lt;/P&gt;&lt;P&gt; dot1x timeout tx-period 3&lt;/P&gt;&lt;P&gt; dot1x timeout supp-timeout 10&lt;/P&gt;&lt;P&gt; dot1x max-req 3&lt;/P&gt;&lt;P&gt; spanning-tree bpduguard enable&lt;/P&gt;&lt;P&gt; switchport nonegotiate&lt;/P&gt;&lt;P&gt; storm-control broadcast level 0.5&lt;/P&gt;&lt;P&gt; storm-control multicast level 10&lt;/P&gt;&lt;P&gt;exit&lt;/P&gt;&lt;P&gt;!&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Fri, 01 Mar 2019 12:41:15 GMT</pubDate>
      <guid>https://community.cisco.com/t5/controllers/pnp-not-deploying-complete-switch-configuration/m-p/3598144#M1183</guid>
      <dc:creator>Joakim Backlund</dc:creator>
      <dc:date>2019-03-01T12:41:15Z</dc:date>
    </item>
    <item>
      <title>Re: PnP not deploying complete switch configuration</title>
      <link>https://community.cisco.com/t5/controllers/pnp-not-deploying-complete-switch-configuration/m-p/3598145#M1184</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;If I compare the configuration in PnP and the running configuration after a successful provisioning it looks like PnP only provided a partial configuration. How do I verify what configuration is really sent to the switch?&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;The switch says so it is satisfied with the configuration downloaded at least. Although not complete. &lt;/P&gt;&lt;P&gt;------------------ show pnp tasks ---------------------&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Certificate-Install Task - Never Run&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Image-Install Task - Never Run&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Config-Upgrade Task - Last Run ID:3, ST:5202, Result:Success, LT:219061, ET:108323 ms&lt;/P&gt;&lt;P&gt;&lt;SPAN&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; Src:[&lt;/SPAN&gt;&lt;A class="jive-link-external-small" href="https://pnpserver" rel="nofollow" target="_blank"&gt;https://pnpserver&lt;/A&gt;&lt;SPAN&gt;.&amp;lt;domain.com&amp;gt;:443/api/v1/file/onetimedownload/eb40303c-0cfd-4d45-970e-75412c992dee], Dst:[running]&lt;/SPAN&gt;&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;CLI-Config Task - Last Run ID:2, ST:5201, Result:Success, LT:105156, ET:223 ms&lt;/P&gt;&lt;P&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; Src:[cli-config request], Dst:[running-config]&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Licensing Task - Never Run&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;File-Transfer Task - Never Run&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Redirection Task - Never Run&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;CLI-Exec Task - Last Run ID:5, ST:5401, Result:Success, LT:286802, ET:11239 ms&lt;/P&gt;&lt;P&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp; Src:[cli-exec request], Dst:[running-exec]&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Mon, 02 Oct 2017 19:58:22 GMT</pubDate>
      <guid>https://community.cisco.com/t5/controllers/pnp-not-deploying-complete-switch-configuration/m-p/3598145#M1184</guid>
      <dc:creator>Joakim Backlund</dc:creator>
      <dc:date>2017-10-02T19:58:22Z</dc:date>
    </item>
    <item>
      <title>Re: PnP not deploying complete switch configuration</title>
      <link>https://community.cisco.com/t5/controllers/pnp-not-deploying-complete-switch-configuration/m-p/3598146#M1185</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;Quick sanity check.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;What version of PnP app?&lt;/P&gt;&lt;P&gt;What version of IOS are you upgrading from?&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Wed, 04 Oct 2017 07:03:36 GMT</pubDate>
      <guid>https://community.cisco.com/t5/controllers/pnp-not-deploying-complete-switch-configuration/m-p/3598146#M1185</guid>
      <dc:creator>aradford</dc:creator>
      <dc:date>2017-10-04T07:03:36Z</dc:date>
    </item>
    <item>
      <title>Re: PnP not deploying complete switch configuration</title>
      <link>https://community.cisco.com/t5/controllers/pnp-not-deploying-complete-switch-configuration/m-p/3598147#M1186</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;Now running PnP 1.5.1.35, when I started the troubleshooting I was running 1.4.1.1159. There are two differences in behaviour between those two versions.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;With 1.4.1.1159 a random number of interfaces on switch one and two were configured but nothing more. To be able to get the switch fully configured I had to delete the old provision job and create a new one without any image pointed out before I did a total reset on the switch via CLI.&lt;/P&gt;&lt;P&gt;With 1.5.1.35 all interfaces on switch 1 and 2 are fully configured but nothing more. Now it is enough to just reset the old provision job and do a complete reset on the switch via CLI.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Switches are mostly delivered with 3.6.6E which we upgrade to 16.3.3 to be able to do full AAA configuration directly without workarounds with EEM script.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;I have a TAC case on this as well.&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Thu, 05 Oct 2017 11:14:44 GMT</pubDate>
      <guid>https://community.cisco.com/t5/controllers/pnp-not-deploying-complete-switch-configuration/m-p/3598147#M1186</guid>
      <dc:creator>Joakim Backlund</dc:creator>
      <dc:date>2017-10-05T11:14:44Z</dc:date>
    </item>
  </channel>
</rss>

