11-28-2025 03:51 AM
Hello,
I installed a pair of remote-leaf switches, they have 2 back-to-back 100Gb links. On ACI they are visible, but the interface status shows as "out of service" when I check from the CLI. I created the vPC domain, but it doesn’t work.
Eth1/33 and Eth1/34 are the b2b links
What am I missing?
Solved! Go to Solution.
11-30-2025 11:27 PM
There’s no configuration to be done, as I said. Once the remote leaves are connected back-to-back, it is supposed to work just like that
11-28-2025 04:27 AM
check below post help you :
=====Preenayamo Vasudevam=====
***** Rate All Helpful Responses *****
11-28-2025 05:00 AM
thank you, but b2b of remote-leaf works just with fabric ports and they have LLDP enabled by default.
Indeed lldp is working between them on eth1/33 and eth1/34
11-28-2025 09:29 AM
Maybe provide more information and configuration output to look at what is wrong?
=====Preenayamo Vasudevam=====
***** Rate All Helpful Responses *****
11-30-2025 11:27 PM
There’s no configuration to be done, as I said. Once the remote leaves are connected back-to-back, it is supposed to work just like that