04-13-2022 09:15 AM
Hello All,
We need to test the TOR switch in a ACI build process...
Its a new build and we need to test the switch reliability / failure and recovery
We need to do a graceful restart of the TOR switch without losing out or disassociating the switch or breaking the build
Is their any way we can do this and achieve this testing..
Regards,
Ranjit
04-13-2022 01:42 PM
what model of TOR switches here ?
04-13-2022 10:18 PM
Nexus 93180YC-FX
04-13-2022 03:34 PM
hi,
You can connect TOR switch in isolation to Spine as a separate uplink?
what exactly do you want to do
Since you have already linked it as a separate Spine link, you can make any changes you want on the leaf side.
04-13-2022 10:54 PM
If I understand correctly, you want to do a restart of a leaf, right?
Easiest way is to do the reload command from CLI:
Leaf1201# reload This command will reload the chassis, Proceed (y/n)? [n]: y
Cheers,
Sergiu