cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
1060
Views
0
Helpful
1
Replies

ACI Contracts compression

I need to switch on contract compression in operational contracts.

1. Is it disruptive to switch contract compression on in living contracts ?

2. Do I need to erase and deploy the subjects again to have the desired impact of the compression or just turn on ?

1 Reply 1

Sergiu.Daniluk
VIP Alumni
VIP Alumni

Hi @Ulrich Vierkoetter 

1. Since the contract compression basically means removing the current entries from TCAM and replacing them with a compressed version of them, most likely there will be a small impact. My suggestion is to perform the change in a controlled change window.

2. no need to deploy the subjects again. Enabling the compression is sufficient. You might also want to have a look at the guidelines and limitations related to policy compression: https://www.cisco.com/c/en/us/td/docs/switches/datacenter/aci/apic/sw/4-x/basic-configuration/Cisco-APIC-Basic-Configuration-Guide-42x/Cisco-APIC-Basic-Configuration-Guide-42x_chapter_0110.html#id_76471

Edit: regarding to point 2, the real answer is "it depends". Check the link above and you will see some specific scenarios where you will need to reapply/reconfigure the subjects.

 

Stay safe,

Sergiu

Save 25% on Day-2 Operations Add-On License