Forum Posts

Hi,  Is there any special procedure for moving APIC connection to new leaf switches ?  Lets say, curretly  APIC --> leaf-A & leaf-Bmove it to APIC --> leaf-C & leaf-D if we simply unplug the cables and re-connect them to new leafs will that work ?

RG02469 by Level 1
  • 542 Views
  • 1 replies
  • 0 Helpful votes

Hi, Really new in ACI environment. I read and watched multiple articles/how-tos and videos about ACI logical design but I am not sure which is the best or applicable for a data center if it has the following: 1. Multisite DC (PDC/DR) 2. Both DC have ...