Hi,
For our lab, we have 1 ESXi server in which we installed our VMs and 1 vAPIC. The server is connected physically to a Leaf with a single port. The vAPIC is working properly.
When I try to bind EPGs (for my VMs) to the port, I have the fault F0467 : "Configuration failed ... due to Invalid Path Configuration,Port Connected to Controller, debug message: port-configured-for-apic: Port is connected to the APIC"
May I know if it is an expected behavior? Should I have at least 2 ESXi uplinks (1 dedicated to the vAPIC and 1 dedicated to others VMs)? Thanks for your advices.