03-11-2019 08:58 AM
Hi there, this is my first time upgrading Nexus 9k switches and just looking for some peace of mind on my upgrade path.
Upgrading 2 nexus devices that are vpc peers one acting as primary no load balancing. The idea is to start with the primary first and let it failover to the secondary during the upgrade.
HIGH LEVEL
Copy NXOS .bin to bootflash: |
Perform #show install all impact nxos bootlfash: Nxos.7.0.3.l4.8b.bin |
Perform #install all nxos bootflash:Nxos.7.0.3.l4.8b.bin |
Copy ELPD .img to bootflash: from file server |
Perform #show install all impact epld bootflash: n9000-epld.7.0.3.l4.8b.img |
Perform #install epld bootflash:n9000-epld.7.0.3.l4.8b.img module all |
Solved! Go to Solution.
03-14-2019 08:48 AM
For anyone wondering, My upgrade went successful using my above plan. VPC peers failed over properly and I was able to maintain connection the whole time.
03-11-2019 09:20 AM
sounds like you have plan in place. ( make sure you take config backup and do it in maintenance window)
here is additional reference document :
03-11-2019 10:36 AM
03-14-2019 08:48 AM
For anyone wondering, My upgrade went successful using my above plan. VPC peers failed over properly and I was able to maintain connection the whole time.