I currently have a network that connect the data center 01 to HQ 01 using 1 link with the the IPADDR scope of 10.10.254.0/24. I typically would think that this should be a point to point link /30 but that is why I am asking for a discussion. What is ...

joshwa by Level 1
  • 1000 Views
  • 1 replies
  • 0 Helpful votes

Hi,I am designing power feed for IT racks that include your products.for example, let's take the c9300-48 UXM-A.it is specified in Table 18 on the datasheet, that the power supply's (PWR-C1-1100WAC)  input current is 6A (240VAC)which means that the i...

Hello,We purchased, C9200-24T , that currently runs with evaluation license. It is understood that smart licensing should be enabled before expiry of eval licensing (starting with code 16.9.1) . However i would like to know what happens if i did not ...

scariaso by Level 1
  • 1628 Views
  • 2 replies
  • 0 Helpful votes

Hallo,I have got a question about this switch. We make a schoolprojekt about the WLAN illumination of our school. The problem is that we can´t find the significant technical aspekts about this switch in the datasheets. It would be very helpfull if so...

I am looking at pros/cons of using Catalyst 9k (9500) as Layer 3 switch for DC. We currently have Nexus 9500 in DC as layer  2 & 3 but there has been serious issues with Nexus stability and reliability during maintenance and software upgrades. We run...

S891 by Level 2
  • 907 Views
  • 1 replies
  • 0 Helpful votes