n3k-c3172-tq-10gt The operating system of the device was started for the first time. Version: 7.0 (3) I2 (2b) Version: nxos.7.0.3.I4.8b.bin --------------------------------------------------------------------------------------------------------First ...

Jun123123 by Beginner
  • 6746 Views
  • 9 replies
  • 0 Helpful votes

Resolved! OTV Backup

We have OTV working good with 2 Data Centers . We plan to add Backup OTV link between the same Data Centers. what should be the main different between them from the points listed below ? 1- Site VLAN 2- OTV site-identifier 0xXXX3- Different otv contr...

Dhari Kh by Beginner
  • 930 Views
  • 3 replies
  • 0 Helpful votes

Dears, i am proposing a 100 gig line card on Nexus 7700 which is of interface type CPAK, from this CPAK interface type i want to connect to another end on nexus 93180YC switches with QSFP-40G-SR-BD  OR QSFP-40/100-SRBD=  by these 2 type of interface ...

adamgibs7 by Frequent Contributor
  • 747 Views
  • 0 replies
  • 0 Helpful votes

HI      we want to connect one blade server internal switch module to different VTEP layer 2 gateway swith    one portchannel(two member port) connect to two vpc peer switch( vxlan vtep layer 2 gateway leaf switch)    two port connect to another set ...

fly by Explorer
  • 1997 Views
  • 7 replies
  • 0 Helpful votes

Hi,    I connect two 3560 one 2960 to two vxlan bleaf1,2 , and create a spanning tree loop under two vpc vxlan vtep.  please to see topo file    1、 I config vlan 21 on bleafs and 3560s,2960  create loop between these swithes , and using pvst    2、 bl...

fly by Explorer
  • 1257 Views
  • 0 replies
  • 0 Helpful votes

Hi All,   I have VPC pairs with L3 Uplink with ISIS on both nexus. How does the VPC pair forward traffic if say Primary Nexus Uplink fails (whether physical uplink port down or ISIS routing down) or vice versa ? There is no ISIS between the pairs. 

Resolved! ISSU in Nexus 9k

Hello, We are planning to introduce nexus N9K-C9508-B3-E switches in our environment and we were using catalyst all these years. We used to do ISSU for software upgrade with near to zero downtime. Would like to know in nexus 9k also we have option of...

RijeeshW by Beginner
  • 1021 Views
  • 1 replies