Data Center Switches

cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Forum Posts

Hi dear all,   recently I got an issue about NX-OS 8.2(1) in 7700 and would like to know some of the policy such as ACL or Route-map doesn't work very well and these rules couldn't filter or redirect traffic as my wish. This is my configurations on F...

spmzt by Level 1
  • 4192 Views
  • 12 replies
  • 0 Helpful votes

I'm confused on the nexus 3548X software upgrade proccess. Following the official upgrade guide, but after software upgrade has completed, I don't know if the bios information is shown correctly to proceed with it.   "show install all status" output ...

Hu371 by Level 1
  • 1635 Views
  • 1 replies
  • 0 Helpful votes

I'll try keep this simple using pictures... We want to get from this:  To this:     The basics are: We are consolidating DC locations for this company/branch as part of a bigger picture strategy.No redundancy with switches at either of these sites e...

Current.JPG Future.JPG
jbekk by Level 1
  • 1649 Views
  • 5 replies
  • 0 Helpful votes

Hi. We are installing a IE-2000U-16TC-GP and adding a separate AC power source connected to the switch:PWR-IE170W-PC-AC. This will allow the 4 PoE ports to receive power.Your problem is that total budget available POE is 65W instead of 170W. Is there...

Hi guys, come across an annoying issue in my organisation and I can't find anything solid online regarding this. As per the title, I have a Nexus 7K and I'm trying to set the MTU size for a specific interface but get the following error: MTU on L2 in...

BrunoDe by Level 1
  • 7589 Views
  • 2 replies
  • 0 Helpful votes