Dear all,I have been investigating the following output. There are several types of Tcam however I think Tcam number means just the slice number right? https://www.cisco.com/c/en/us/support/docs/switches/nexus-9000-series-switches/119032-nexus9k-tcam...

mhiyoshi by Level 3
  • 821 Views
  • 8 replies
  • 0 Helpful votes

Does the N9K 9200/9300 series require a reload when changing to store and forward mode? The documentation doesn't mention a reboot for nexus 9K. The only nexus switches where I see a reload is necessary is the 5600. https://www.cisco.com/c/en/us/td/d...

sp2720401 by Level 1
  • 248 Views
  • 1 replies
  • 0 Helpful votes

I am trying to build two standard L3 POs between two N9Ks (running as vPC) and a C9500 stack with 100Gbps ports. The two L3 P2P POs would be used for OSPF peerings later. High-level topology is attached below. When I enable the Po-1 on both ends, the...

Drawing1.jpg
m1xed0s by Spotlight
  • 225 Views
  • 1 replies
  • 0 Helpful votes