As per Cisco document below is the ACI discovery flow:- 1. LLDP Exchange2. TEP through DHCP3. ISIS protocol Adjacency4. certification validation5. DME start When Image will be upgraded in the process flow? Is it before ISIS adjacency or after certifi...

kumarH by Level 1
  • 1504 Views
  • 6 replies
  • 0 Helpful votes

Are data center switches non blocking? Is it an important feature in a data center switch? For example, Cisco Nexus C36180YC-R,It has got:- Switching capacity: 3.6 Tbps (48x25+6x100=1800 Gbps half duplex x2)- Forwarding Rate: 1.67 BppsI calculate the...

jmprats by Level 4
  • 1291 Views
  • 2 replies
  • 0 Helpful votes

Hi Guys I have a query on routing between devices connected to a nexus switch. Physical topology:There is an active firewall and two WAN routers in the active data centre.There is a standby firewall and a single WAN router in the standby data centre....

Hi All, I have a lab setup with 2 leafs and 2 spines and use VXLAN BGP EVPN. There is also a VPC peer link between the leaf devices. For some reason all traffic is being learnt via the peer link and not over the NVE interfaces, is there a reason for ...

jay_7301 by Level 1
  • 1233 Views
  • 4 replies
  • 0 Helpful votes

Hi Community, We have configured SNMP on a couple of Nexus 9k. All devices are using the same SNMP config. The monitoring system is able to poll all the devices and also generate network map with all active connections, so communication seems ok.  Ho...

n.t85 by Level 1
  • 5050 Views