We have vxlan multisite topology in CML. When we create l2vni between site and start ping from client in site 1 to client in site 2 we get 100% CPU LOAD on BGW because on arp loop.APR request goes from the 1st site bgw  to the 2nd site bgw, then the ...

Hello everyone I've just unboxed some new N9K-C93180YC-FX3 V01 and N9K-C93108TC-FX3P V03. The plan is to use the 180 as parent switches and the 108 as fex (software fex mode). The thing is, i just can't get these things to run and can't find anything...

LukiG by Level 1
  • 901 Views
  • 4 replies
  • 0 Helpful votes

You entered mmod in 9.3(9).During interface shutdown, the equipment was stuttering and the interface status was input/adminCfg/down/up, etc., and the direct -> success took about 3 minutes to complete shutdown.Is there anyone who has experienced the ...

moons_0-1751517297135.png
moons by Level 1
  • 94 Views
  • 0 replies
  • 0 Helpful votes

HI, I've two pairs of C9396PX and we decided to upgrade to two pairs of C93360YC-FX2, they are in vpc, i'm reading other post and tech guides, but it's a little bit confused, we need to migrate from oldest to newest, my question is, it's possible to ...

IvanGO by Level 1
  • 267 Views
  • 1 replies