We have one pair of N5K's and planning on migrating them to a pair of N9K's.
I am not Network engineer, but I am seeking for steps to migration without downtime, as detail as possible.
What I can think of is that join these two N9K's in fabrics first, then move one cable connection from N5K to N9K at one time, is that a good approach?
Thanks in advance!