04-06-2021 06:39 AM
Hello,
I have two Nexuses 9300 connected together in VPC domain.
I need to replace one of the N9K.
Is such procedure somewhere? I've tried to fond but I found only procedures for Nexus 7000 and Nexus 5000.
Solved! Go to Solution.
04-13-2021 02:54 AM
Hi @dacieplinski,
You can find a similar procedure via the below link:
04-13-2021 02:54 AM
Hi @dacieplinski,
You can find a similar procedure via the below link:
04-13-2021 04:31 AM
Thank you very much.
I haven't noticed this part of documentation before.
Different scenario: single switch has failed.
In this case, when the replacement switch comes, I assume that I need to follow similar procedure:
1. Do not connect any links to the NEW_switch (except OoB mgmt)
2. Upgrade the NEW_switch to the proper firmware version
3. Copy the configuration (from the OLD switch - archived) to startup config.
4. Shutdown all vPCs and uplink ports, except vPC peer link and OoB interface, save the configuration
4. Power off the NEW_switch (can I reload instead?)
5. Make all connections
6. Power on the NEW_switch
7. Bring up all vPCs and uplink ports
Am I correct?
04-14-2021 01:18 AM
Actually, I don’t think there are any specials that are different between N9K and N7K/N5K, the only thing you need to pay attention to is "Sticky bit" should be FALSE when you connect the new switch to your network.
N9K# show system internal vpcm info all | i i sticky
Sticky Master: FALSE
So, I think that "Poweroff the NEW switch" -> "make all connections" -> "Power on the NEW switch" is the best for your scenario.
04-14-2021 01:22 AM
Thank you very much again and best regards.