Hi,
in a customer environment we need to change the path cost method from short to long. The core switches are currently 2 VSS and the other are N9K and N5500 switches.
I noticed starting from the root will be a best practice. Does anyone has experience with such a change? And what can be the outage or disruption within the net?
Thanks
Udo