02-08-2019 06:03 AM
If i shutdown the pair in VSS, can I bring them both UP sententiously or should I bring the main switch Up first and then the secondary? The switch is C6832-X-LE.
Thanks!
02-10-2019 09:55 AM
02-10-2019 01:22 PM
As long as you have good configuration in Place, it not matter as suggest by @Francesco Molino.
Personally if this live environment, i do 1 chasis at a time and make sure all links coming up as expected by checking the logs and show switch and other VSS related commands.
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide