cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
364
Views
0
Helpful
2
Replies

7925G verification steps after install on 2911 ISR/CME

michael murphy
Level 1
Level 1

  After configuring the 2911 in a lab environment, I need to verify the 7925G works but with no dialtone what can I do to ensure its configured/operating properly BEFORE I go onsite to install the 2911 ad 7925G?    Any 7925G simulator should I need to isolate problem to the CME configuration rather than the wireless or QOS setup? There must be some checklist to run in sequence after the install...right?             

2 Replies 2

paolo bevilacqua
Hall of Fame
Hall of Fame

There is not. If it doesn;t work you will have to address problems onsite.

                   What steps (checklist) can I follow to verify the install is correct (ie, dhcp, tftp accessible, wireless, qos issues, etc.)? It seems like there are endless issues that could arise so what is a process to begin to verify it is correct. Onsite is 5 states over so whatever 7925 simulator or checklist would be helpful.