ISE 1.4 Sponsor Portal wrong duration of guest tickets

jheuke007
Level 1
Level 1

Hi to all,

we're using ISE 1.4.0.253 patch 3.

Somehow the guest tickets created from sponsor portal have the wrong duration.

For example:

duration of 3 days

start time: 2015-08-31 8:12am

end time: 2015-09-02 8:12am

that's just 2 days instead of 3!

In the ticket summary it says remaining time 2 days 0 hours.

So the real ticket duration is: set duration -1

How can we fix that?

Thank you

Jasmin

5 Replies 5

jan.nielsen
Level 7
Level 7

Are you sure your sponsor and the guest type is allowed to create accounts of that length?, i believe that if you try to set a longer length than allowed ISE will auto adjust to the longest allowed account length.

What happens if you select 4 days, do you get 3 days or 2 days length?

Hi Jan,

if I select the length of 4 days I get 3 days.

The max duration allowed to choose by the sponsor is 7 days (so 6 in that case)

Hmm, that certainly sounds like a bug of some sort, have you tried changing from days to hours and check if it's then 1 hour less than requested or if it's always 1 day less ie. 24 hours?

ha! that's interesting. I switched from days to hours (168 = 7 days) and it worked fine!

Thought I'd be on the "safe side" with ne latest patch 3 ?!

Thanks for your help!

Interesting, i will have to test this in my lab myself. I guess mistakes sneek into patches, i actually don't recall having seen this problem in 1.4 without patch 3.