Networking Knowledge Base

cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Don't miss this Cisco Catalyst 8000 offer

 
Labels

Knowledge Base Articles

Core IssueThe Catalyst 6500/6000 series switches use the Policy Feature Card (PFC) on the supervisor engines to switch Layer 3 (L3) traffic in hardware, when combined with a Multilayer Switch Feature Card (MSFC) which programs the PFC. The PFC also p...

TCC_2 by Level 10
  • 5621 Views
  • 0 comments
  • 0 Helpful votes

Core issueThe syntax of this error message is:%SYS-3-PORT_IN_ERRORS: Port [dec]/[dec] detected [dec] input error(s) in last 30 minutes This message indicates that a port has experienced an input packet error. [dec]/[dec] is the module number and port...

TCC_2 by Level 10
  • 1577 Views
  • 0 comments
  • 0 Helpful votes

ResolutionIt is possible to copy files to the flash devices of the standby supervisors with the 2/slot0: or 2/bootflash: command options in order to load a new image on the standby supervisor engine that is different from the image on the active supe...

TCC_2 by Level 10
  • 11753 Views
  • 0 comments
  • 5 Helpful votes

Core issueThe reason for this could be that you used archive download-sw /leave-old-sw in the download option. The /leave-old-sw option keeps the old software version after a download. When you enter reload, this only reloads the active switch. This ...

TCC_2 by Level 10
  • 847 Views
  • 0 comments
  • 0 Helpful votes

ResolutionIn Cisco Catalyst 4000/4500 Series switches, the software running on the Supervisor(Sup) cannot be converted from CatOS to Cisco IOS , nor can the reverse action be performed.The software supported on Cisco Catalyst 4000 Series switches dep...

TCC_2 by Level 10
  • 2388 Views
  • 0 comments
  • 0 Helpful votes

ResolutionCisco NAM-1 and NAM-2 share the same hardware architecture and software applications, but are different in these respects:NAM-2 has an additional accelerator card that provides extra-high packet-processing performance for full-scale gigabit...

TCC_2 by Level 10
  • 1578 Views
  • 0 comments
  • 0 Helpful votes

Core issueThese error messages appear in the logs:%KERNEL-1-CREATEPROCESSFAILED:Error in creating process: Unavailable free stack; stack type: 2; Name: tnetproc%MGMT-2-SESSION_FAIL:Out of telnet processes.  Try later.The %KERNEL-1-CREATEPROCESSFAILED...

TCC_2 by Level 10
  • 1863 Views
  • 0 comments
  • 0 Helpful votes

Core IssueRoute redistribution is used to propagate routes that are statically configured or learned through one routing protocol into another routing protocol. However, at times, the static routes might not get redistributed into various protocols o...

TCC_2 by Level 10
  • 15392 Views
  • 0 comments
  • 0 Helpful votes

Core issueA Cisco Catalyst 6500 switch with Supervisor 2 engine (Sup2) that runs Catalyst Operating System (CatOS) 7.4(3) can crash with the PID SptTimer process.The PID refers to the Process Identification number and SptTimer is the process that con...

TCC_2 by Level 10
  • 839 Views
  • 0 comments
  • 0 Helpful votes
Getting Started

Find answers to your questions by entering keywords or phrases in the Search bar above. New here? Use these resources to familiarize yourself with the community:

Top Contributors
Featured Article