design network topology and upgradation from 1G to 10G

Daps
Level 1
Level 1

Hi,

 

we are in process to upgrade Network bandwidth from 1G to 10G with eliminating single point of failure.  Attached diagram for your reference.

 

Point 1 - Earlier there is only one switch (L2) and single port of Router. Now, we use ASR Cluster and Stack switch for high availability and redundancy.

PLAN - we are planning to create ETHERCHANNEL on both end. (ASR and StackSWITCH)

 

Point 2 - With the help of CHECKPOINT support team, We are planning to create Bond of 2 Ports and connect each port to both the Stackable switches.

PLAN - We are configured the ports as Trunk on switches.

 

Point 3 - ACI Side, We are creating VPC domain with 2 Leaf switches and connect cables as per diagram.

 

 

Whether this scenario works or not and please share any suggestions.

 

 

 