cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
1618
Views
0
Helpful
3
Replies

Upgrade CPI 3.1 to 3.8

jmecklenburg
Level 2
Level 2

Hi Team

I have a CPI version 3.1 in a "PI-UCS-APL-K9" and I need upgrade at lest to version 3.4 for compatibility with Cisco 9200 Switch but I want upgrade to version 3.8.

I cheked and the upgrade it's posibly, I need upgrade to version 3.4 then 3.6 and then 3.8.

But I need to know if a have some problem with the license or just follow the upgrade processes and don't should have any problem.

Regards

fixie rider
3 Replies 3

marce1000
VIP
VIP

 

 - If you follow the required upgrade steps  then you will not have problems with the license(s).

 M.



-- ' 'Good body every evening' ' this sentence was once spotted on a logo at the entrance of a Weight Watchers Club !

Mikeb14cisco
Level 1
Level 1

I would suggest sticking with 3.6

 

3.8 is not ready for Prime time, and we had several upgrade issues. 

 

Remember backup your data before beginning any upgrade. 

 

 >...3.8 is not ready for Prime time, and we had several upgrade issues. 

 

                             - Always useful to share what those issues are.

 M.

 



-- ' 'Good body every evening' ' this sentence was once spotted on a logo at the entrance of a Weight Watchers Club !