Hi All,
We have a CUCM cluster where all the UC applications are hosted in a single site. We are now planning to built a DR site for the UC applications. The end state would be like DC (CUCM Pub, 1 TFTP Pri, 3 Sub, 1 Unity Connection) & DR (1 TFTP Sec, 3 Sub, 1 Unity Connection).
Would like to know what parameters we need to consider when we are building this DR site.