hello experts,Just I have a quesiton, and much apprecicate if you can  provide the answer.my question is; what is IP Planning / Operation department in GSM or SP companies?thanks a lot in advance.

We have four 7Ks (two in Data Center 1 and two in Data Center 2) which are used to implement OTV in a multi-homed configuration.  I've included a PDF which shows the L2 and L3 topology.  When one of the links went down (as depicited in the 2-page dia...

I am trying to figure out a best Nexus solution for my Network which comprise of HP Server Platforms. (HP-DL380p Gen8 E5 Proliant.We generally have VLANs within the LAN and MPLS in Metro Links and IPVPN on WAN Links.Being new in the Fabric world, Env...

Hi all,I´ve got a problem with a new line-card I´d like to install in our Nexus 7010.Informations around the N7k:Installed SW (system/kickstart) NXOS 6.1(1).3x 6kw power.Line-Card should be installed in Slot 8. There´s already a F-card (N7K-F248XP-25...

g8104 by Level 1
  • 2052 Views