Other Data Center Subjects

cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Save 25% on Day-2 Operations Add-On License

 

Forum Posts

Ask Me Anything Event   Thank you for joining us for the Expert Insights Series on ACI & NDI: Empowering Data Center Excellence!  Our Customer Success Specialists Cody Albea, Peter Nalley and Manuel Valasco will be available from May 15, 2025 throug...

Screenshot 2025-05-13 at 12.35.04 PM.png peter nalley headshot - Lindsey Taylor.jpg Manuel Valasco headshot.jpg

All,We had four fully loaded chassis (B series, B200 M2) and the two redundant 6140s reboot yesterday.  It all just died apparently.   We think the issue was power but the event log on the fabrics doesn't go back far enough to show us the start of th...

dulmer by Level 1
  • 1611 Views
  • 1 replies
  • 0 Helpful votes

Resolved! fixed wire testing

Hello,I am a Datacentre Manager for a company with 21 racks (3 rows of 7). An external company has a contract to look after and do all the PAT testing and Fixed Wire Testing in out company buildings and want to do fixed wire testing in the DC.I would...

ohareka70 by Level 3
  • 3442 Views
  • 6 replies
  • 0 Helpful votes

Resolved! data center Design

hi,if  you need to design a large campus area network with two 6500 and edge  switches and distribution switches what will be the best design1. is it better to etherchannel two 6500 at the core OR is it better to run routing protocol between both the...