Hi.
N55-M16UP add modules after setting the Nexus5548UP
After installing the interface module that is automatically generated?
Do I need to reboot during FCoE interface settings?
Feature FCoE is enabled.
Thank's
01-26-2017 11:06 AM
Jongsu,
I am getting ready to install 2 N55-M16UP units to 2 5548UPs. Were they hot swappable and did you need to reboot the units
Thanks,
Tom
01-27-2017 01:44 PM
Hi Tom
see http://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus5000/hw/installation/guide/nexus_5000_hig/overview5500.html#18319
You can hot swap the expansion modules during operations, except the Layer 3 GEMs. You must power down the switch before you can insert or remove the Layer 3 GEMs.
01-30-2017 12:23 PM
Thanks,