cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
288
Views
0
Helpful
1
Replies

6509 and redundant Sup720, any gotchas?

eperez
Level 1
Level 1

We just received a Catalyst 6509 with two WS-sup720 supervisor engines. I'm just wondering of any any gotchas before we put this switch into production.

thanks.

1 Reply 1

thisisshanky
Level 11
Level 11

A min of 2500 W would be needed for the sup 720. (depends also on other modules installed).

A fan tray upgrade (WS-C6K-9SLOT-FAN2) can be done to provide additional cooling for equipments.

the supervisor has to be installed in slots 5/6.

Sankar Nair
UC Solutions Architect
Pacific Northwest | CDW
CCIE Collaboration #17135 Emeritus

Review Cisco Networking for a $25 gift card