We just received two Catalyst 3750X switches. Cisco's documentation provides cabling installs for StackPower in a three or more switch example. Can someone clarify the cabling of the two cables between two switches? Having two cables with green and yellow on either side and a switch with both colors signified beside it is a little confusing especially when considering electricity.