Hi,

I am getting some timestamp confusion when creating an IPM job. The time I defined eg 3:30pm in the afternoon is displayed in the graph as 22:00 - why is that?

Thanks

Helena

2 Replies 2

irisrios
Level 6
Level 6

Has it something to do with the DayLight savings and the 24hr format?

Hi,

Thank you for replying.

I am not sure if it does. How do I check to make sure that, it is not Daylight savings and the 24hr format that is causing the problem?

Thanks.

Helena