03-28-2014 04:36 AM - edited 03-07-2019 06:53 PM
Hi Team,
We have one Cisco 3850 Switch installed at the Customer site and getting the message as below,
Mar 28 10:57:11.578: %SPI_FC-3-HIGH_WMARK_REACHED: Number of messages in the queue for channel 9 has reached maximum.
-Traceback= 1#830db5fd318976b0280defe233875463 :10000000+153F71C :10000000+B5E9B0 :10000000+B5EBA4 :10000000+3CC5CC :10000000+3CD0B4 :10000000+39AB00 :10000000+27CDD2C :10000000+7C7814 :10000000+27AC29C
.Mar 28 10:58:31.585: %SPI_FC-3-HIGH_WMARK_REACHED: Number of messages in the queue for channel 9 has reached maximum.
-Traceback= 1#830db5fd318976b0280defe233875463 :10000000+153F71C :10000000+B5E9B0 :10000000+B5EBA4 :10000000+3CC5CC :10000000+3CD0B4 :10000000+39AB00 :10000000+27CDD2C :10000000+7C7814 :10000000+27AC29C
--More-- .Mar 28 10:59:51.586: %SPI_FC-3-HIGH_WMARK_REACHED: Number of messages in the queue for channel 9 has reached maximum.
-Traceback= 1#830db5fd318976b0280defe233875463 :10000000+153F71C :10000000+B5E9B0 :10000000+B5EBA4 :10000000+3CC5CC :10000000+3CD0B4 :10000000+39AB00 :10000000+27CDD2C :10000000+7C7814 :10000000+27AC29C
Please suggest the meaning of these messages and suggestion for resolution on the same.
Attaching show version, show logging for this Switch.
Regards
Ashutosh