01-22-2015 08:54 AM - edited 03-20-2019 08:27 PM
Having issues with backup & restore on ACS 5.5 running on 3495 platform.
Incremental backups are scheduled daily at 2 AM. Full backup is scheduled weekly at 6 AM. Data Purge is scheduled for 4 AM (by the system - unable to change this value).
Log Collector has crashed a couple of times when a full backup is attempted (manual or automated).
TAC had us move database file to a repository and then clean the database. After the clean, incremental backups sometimes run at 2 AM as scheduled and then at 6 AM. No idea why.
The data purge job has failed. I don't think it's running any more.
Incremental backup failed at 6 AM yesterday (1/21/15) because "another backup or restore was already in progress". Incremental backup wasn't supposed to run at 6 AM. Apparently, this caused the system to turn scheduled backups "off", so now backups aren't running at all.
Has anyone else experienced these issues? Is there a known fix?