02-17-2016 10:04 PM - edited 03-05-2019 03:22 AM
Dear Team,
Customer had a concern that he want do upgrade the L3 device with minimum downtime.
Current version running is 12.2 and upgrading to new version 15.0.2.
He is concern of zero downtime with respect to access Switch.
He has 2960 sw at a access later and has etherchannel configured towards L3 (i.e. one link goes to SW1 and other link goes to SW2). This L3 switches are stacked.
Now he is planning to load the image in master and slave.
He will reboot only the master SW1 and now the stack will break and traffic of 2960 will go from Sw2.
After SW1 comes up they will reboot SW2 and now the traffic of 2960 will go from SW1.
After both are on the same version he will form the stack of both the Switches so that user dont face any issue or we can upgrade with minimum downtime.
Pls let me know whether I can go with this procedure.
Pls find the attached for the network diagram.
Thanks in advance
Regards,
Vikas
02-06-2018 07:34 AM
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide