Storage Networking

cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Save 25% on Day-2 Operations Add-On License

 

Forum Posts

Hello, I need to know what is the best practice while connecting Dell Compellent SC8000 with CISCO UCS chassis. below is the scenerio. Equipment: 1) 1x Cisco UCS blade chassis  2) 2x FEX IOM with 8 ports 3) 2x Fabric Interconnect switches 4) 2x C...

Dear community,I´m a little bit confused about the zoning of the MDS 9148s SAN switch.Zoning via CLI is totally clear. I already performed this on several MDS switchesBut now our customer wants to configure his zoning via GUI.The former fabric manage...

Hi everybody, I'm installing a Nexus 56128P and I try to configure Fibre Channel native interface on GEM N56-M24UP2Q. I have configured the ports to be fc interfaceslot 2port 1-24 type fcThen i have reloaded the module, but no fc interface appeared (...

Does B22hp support FC uplink to Nexus 5K Unified Port, instead using FCoE to non-Unified Port? I only saw FCoE at the deployment guide. To my understanding, FC only use 8Gb, FCoE can fully use 10Gb bandwidth.  If it supports both FC and FCoE, Any oth...

hujian by Level 1
  • 487 Views
  • 1 replies
  • 0 Helpful votes

In most documentation that mentions No Payload Encryption required countries, it never mentions what countries those are.  No search has come up with a viable list, does anyone know a list of NPE required countries?

TAC ID   : prakashkalluri Model   : UCSC-C220-M4S S. No     : FCH1932V3A0 Problem Details : HBA card not visible in storage switch end.Even we tried reseting the HBA physically.Only 1 HBA is connected.Let me know your advice to proceed. 

I was browsing the INE CCIE Data Center courses and came across the sample video under storage.  The topic is SAN Port Channels. My question is in the diagram, they show 2 JBODs, connected below it are 2 MDS switches, and below that connected to 2 Ne...