I have 2 core switches (Catalyst 4506 models) in the data center with HSRP Configuration it is both connected with a copper port. And I have another building next to the data center which is having 2 distribution switches of Meraki 9300 models and they both are stacked. How will I provide redundant 2 fiber uplink paths between core switch and distribution switches as I want to pass the vlans in core switch to the meraki distribution switch. I cant stack 2 core switches right now (even if it is possible). How will I configure here without any loop issues as Core switches are already running on live now without any issues. My New tower with Meraki switches I have to enable with redundant links without causing any network disruption in the existing setup. How will I configure on both sides, is it through LACP or not? Pls provide a solution.
See the diagram attached.