Hello,
i have 4 3750 in stack:
H/W Current
Switch# Role Mac Address Priority Version State
----------------------------------------------------------
1 Member 001a.a1a3.d280 10 0 Ready
*2 Master 001a.a1c1.f200 15 0 Ready
3 Member 04fe.7f5e.f200 1 1 Ready
4 Member 04fe.7f5e.8880 1 1 Ready
after a PDU failure, switch nr 1 and nr 3 are gone away...
after that, all stack stopped his switching and routing works. when i turned on the powered OFF switches, i must shut down and reactivate all portchannel versus cisco 7600 router ( i founded the ports in blocking state ), and also vertus other cisco switch.
Any idea ?