11-15-2008 10:10 AM - edited 03-06-2019 02:30 AM
Using a current 2950, and replacing with a 3750G POE-with an additional 3950G as a back-up (stack) is there a configuration sheet that will give me a step-by-step CLI so I can configure the new switch with my current 2950 configuration?
11-15-2008 10:15 AM
Hello Leroy,
I would first configure the stack of the two new C3750s.
Actually, the ports will be seen as 1/0/x and as 2/0/y after you have the stack running.
After having done this, the configuration of the single port can be copied to the right port(s).
port 0/x on c2950 becomes 1/0/x and 2/0/x on the c3750 stack if you want to have a backup switch.
if the second C3750 is for backup I wonder if the stack is useful.
Hope to help
Giuseppe
11-17-2008 06:34 AM
If I the 3750 config works I will let everyone know the details less headaches for everyone else
11-17-2008 05:28 AM
Hi Leroy,
Hi i think it will be better if the other switch is 3750 as well .Here is the link
11-17-2008 05:34 AM
Hey Dave,
Thanks for your help-this may get me rolling in the right direction.
Regards,
Roy
11-17-2008 06:02 AM
Thanks
don't forget to rate
HTH
DAk
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide