Switching

Discuss Catalyst brand switches with peers and experts.
cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Get 20% off switches when you combine Cisco solutions

 
Labels

Forum Posts

Resolved! Stack Power Cable

I need a stack power cable for a cisco 9300. I have a 3750x stack power cable on hand. Will that work with 9300s?

Rsbell by Level 1
  • 1520 Views
  • 5 replies
  • 0 Helpful votes

Came across this curious "sh int status" results on a non-stacked Cisco WS-C3850-12XS switch.  This is an OT switch and it would be nice to know how to get it so that the gi ports read 1/0/1-24.  I was thinking in global configuration mode. Issue the...

brianw360 by Level 1
  • 389 Views
  • 3 replies
  • 0 Helpful votes

hi,i'm unable to remove these command lines in a C9300 switch.i don't have use for it and takes up unnecessary config space/lines.C9300(config)#no policy-map system-cpp-policyC9300(config)#C9300(config)#no class-map match-any system-cpp-police-ewlc-c...

Hi,correct me please if I am wrong.In theory, if you only want to block DHCP frames offered on untrusted ports, globally enabling the DHCP Snooping mechanism and specifying interfaces that are trusted and untrusted should be enough. In this case, spe...

Michał M by Level 1
  • 620 Views
  • 5 replies
  • 1 Helpful votes

Hello, I am a networking student and I am working on a project about VLAN.My problem is VLAN 204 cannot ping VLAN 202 and VLAN 206. Any help please?VLAN 202 Multimedia (Port F0/1-10) 192.168.202.0/24VLAN 206 SalesMarketing (F0/11-15) 192.168.206.0/24...

Hello guys,At midnight UTC, our core switches (a stack of 2 x C9300L-24T-4G) experienced a failure of the Auto-LAGG process, causing all the port using it for LACP to go offline. Mar 26 23:59:56.781: %ETC-5-L3DONTBNDL2: Gi1/0/1 suspended: LACP curren...

I have 2 core switches of model  catalyst 6506-e. Both are interconnected by VSS. Each core switch have 2 supervisor engine module VS-S720-10G. Total 4 supervisor engine module. If one module in switch A failed then the other switch B module takeover...

Hello,Recently I was advised on this forums to switch over to Virtual Stackwise from HSRP on the Core Switches we have running on the network. I have deleted all of the HSRP configurations and wiped the switch that is going to be the standby switch (...

dannyh by Level 1
  • 1117 Views
  • 9 replies
  • 0 Helpful votes