cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
3559
Views
0
Helpful
13
Replies

Cat9300P-E 2 TwentyFiveGig not appeared after upgrade to Everest recommended Image

Steev112
Level 1
Level 1

Hi,

 I have CAT9300 switches after upgrading to "cat9k_iosxe.16.06.04a.SPA.bin: it gave me these error.

 

interface TwentyFiveGigE1/1/1
^
% Invalid input detected at '^' marker.

interface TwentyFiveGigE1/1/2
^
% Invalid input detected at '^' marker

 

Thanks

13 Replies 13

marce1000
VIP
VIP

 

 - Follow the boot process on a console link after the upgrade, check for errors. Also just after the switch has booted issue show logging ; check if you can find more info concerning your problem.

M.



-- ' 'Good body every evening' ' this sentence was once spotted on a logo at the entrance of a Weight Watchers Club !

Hi Marce,

i have followed upgrade procedure as follows:

 

request platform software package install switch all file flash:cat9k_iosxe.16.06.04a.SPA.bin auto-copy
install add file flash:cat9k_iosxe.16.06.04a.SPA.bin activate commit
reload

Can you downgrade the firmware and see if the TwentyFiveGig interface returns or not?

The image was "16.8.1r" and i installed the recommended image.

do you want me to use that image.

 

Thanks

I know the reason why: Is there a 25 Gbps interface module (C9300-NM-2Y) installed?

Hi Lea,

below is the show inv:

 

NAME: "c93xx Stack", DESCR: "c93xx Stack"
PID: C9300-48P , VID: V02 , SN: FOC2238Q051

NAME: "Switch 1", DESCR: "C9300-48P"
PID: C9300-48P , VID: V02 , SN: FOC2238Q051

NAME: "Switch 1 - Power Supply A", DESCR: "Switch 1 - Power Supply A"
PID: PWR-C1-715WAC , VID: V03 , SN: LIT223526E4

NAME: "Switch 1 FRU Uplink Module 1", DESCR: "8x10G Uplink Module"
PID: C9300-NM-8X , VID: V01 , SN: FOC22352AWC

Hi Leo.

do you know what is the issue?

 

Thanks


@Steev112 wrote:

 NAME: "c93xx Stack", DESCR: "c93xx Stack"
PID: C9300-48P , VID: V02 , SN: FOC2238Q051

NAME: "Switch 1", DESCR: "C9300-48P"
PID: C9300-48P , VID: V02 , SN: FOC2238Q051

NAME: "Switch 1 FRU Uplink Module 1", DESCR: "8x10G Uplink Module"
PID: C9300-NM-8X , VID: V01 , SN: FOC22352AWC


I think I know what the issue is.  

The switch is a 9300-48P.  This means it is a 48 port triple speed ethernet.  There is a C9300-NM-8X module.  This module only supports SFP+.  Nowhere in the "sh inventory" does it say the switch has C9300-NM-2Y (2 x 25 Gbps ports).  

 

 - You are not replying to my questions.

M.



-- ' 'Good body every evening' ' this sentence was once spotted on a logo at the entrance of a Weight Watchers Club !

Below is the show logging:

 

Switch#show logging
Syslog logging: enabled (0 messages dropped, 5 messages rate-limited, 0 flushes, 0 overruns, xml disabled, filtering disabled)

No Active Message Discriminator.

 

No Inactive Message Discriminator.


Console logging: level debugging, 55 messages logged, xml disabled,
filtering disabled
Monitor logging: level debugging, 0 messages logged, xml disabled,
filtering disabled
Buffer logging: level debugging, 59 messages logged, xml disabled,
filtering disabled
Exception Logging: size (4096 bytes)
Count and timestamp logging messages: disabled
File logging: disabled
Persistent logging: disabled

No active filter modules.

Trap logging: level informational, 61 message lines logged
Logging Source-Interface: VRF Name:

Log Buffer (4096 bytes):
e correctly understood
*Dec 26 08:46:57.958: %SYS-5-CONFIG_I: Configured from memory by console
*Dec 26 08:46:58.125: %SYS-5-RESTART: System restarted --
Cisco IOS Software [Everest], Catalyst L3 Switch Software (CAT9K_IOSXE), Version 16.6.4a, RELEASE SOFTWARE (fc3)
Technical Support: http://www.cisco.com/techsupport
Copyright (c) 1986-2018 by Cisco Systems, Inc.
Compiled Fri 26-Oct-18 18:15 by mcpre
*Dec 26 08:46:58.156: %SSH-5-ENABLED: SSH 1.99 has been enabled
*Dec 26 08:46:58.305: %HMANRP-6-HMAN_IOS_CHANNEL_INFO: HMAN-IOS channel event for switch 1: EMP_RELAY: Channel UP!
*Dec 26 08:46:58.306: %HMANRP-6-EMP_NO_ELECTION_INFO: Could not elect active EMP switch, setting emp active switch to 0: EMP_RELAY: Could not elect switch with mgmt port UP
*Dec 26 08:46:59.050: %LINK-5-CHANGED: Interface GigabitEthernet0/0, changed state to administratively down
*Dec 26 08:47:00.011: %LINK-3-UPDOWN: Interface GigabitEthernet1/1/1, changed state to down
*Dec 26 08:47:00.012: %LINK-3-UPDOWN: Interface GigabitEthernet1/1/2, changed state to down
*Dec 26 08:47:00.012: %LINK-3-UPDOWN: Interface GigabitEthernet1/1/3, changed state to down
*Dec 26 08:47:00.013: %LINK-3-UPDOWN: Interface GigabitEthernet1/1/4, changed state to down
*Dec 26 08:47:00.013: %LINK-3-UPDOWN: Interface TenGigabitEthernet1/1/1, changed state to down
*Dec 26 08:47:00.013: %LINK-3-UPDOWN: Interface TenGigabitEthernet1/1/2, changed state to down
*Dec 26 08:47:00.013: %LINK-3-UPDOWN: Interface TenGigabitEthernet1/1/3, changed state to down
*Dec 26 08:47:00.013: %LINK-3-UPDOWN: Interface TenGigabitEthernet1/1/4, changed state to down
*Dec 26 08:47:00.013: %LINK-3-UPDOWN: Interface TenGigabitEthernet1/1/5, changed state to down
*Dec 26 08:47:00.013: %LINK-3-UPDOWN: Interface TenGigabitEthernet1/1/6, changed state to down
*Dec 26 08:47:00.013: %LINK-3-UPDOWN: Interface TenGigabitEthernet1/1/7, changed state to down
*Dec 26 08:47:00.013: %LINK-3-UPDOWN: Interface TenGigabitEthernet1/1/8, changed state to down
*Dec 26 08:47:00.013: %LINK-3-UPDOWN: Interface FortyGigabitEthernet1/1/1, changed state to down
*Dec 26 08:47:00.013: %LINK-3-UPDOWN: Interface FortyGigabitEthernet1/1/2, changed state to down
*Dec 26 08:47:00.123: %LINK-3-UPDOWN: Interface Vlan1, changed state to up
*Dec 26 08:47:01.018: %LINEPROTO-5-UPDOWN: Line protocol on Interface GigabitEthernet1/1/1, changed state to down
*Dec 26 08:47:01.019: %LINEPROTO-5-UPDOWN: Line protocol on Interface GigabitEthernet1/1/2, changed state to down
*Dec 26 08:47:01.019: %LINEPROTO-5-UPDOWN: Line protocol on Interface GigabitEthernet1/1/3, changed state to down
*Dec 26 08:47:01.019: %LINEPROTO-5-UPDOWN: Line protocol on Interface GigabitEthernet1/1/4, changed state to down
*Dec 26 08:47:01.019: %LINEPROTO-5-UPDOWN: Line protocol on Interface TenGigabitEthernet1/1/1, changed state to down
*Dec 26 08:47:01.019: %LINEPROTO-5-UPDOWN: Line protocol on Interface TenGigabitEthernet1/1/2, changed state to down
*Dec 26 08:47:01.019: %LINEPROTO-5-UPDOWN: Line protocol on Interface TenGigabitEthernet1/1/3, changed state to down
*Dec 26 08:47:01.019: %LINEPROTO-5-UPDOWN: Line protocol on Interface TenGigabitEthernet1/1/4, changed state to down
*Dec 26 08:47:01.019: %LINEPROTO-5-UPDOWN: Line protocol on Interface TenGigabitEthernet1/1/5, changed state to down
*Dec 26 08:47:01.019: %LINEPROTO-5-UPDOWN: Line protocol on Interface TenGigabitEthernet1/1/6, changed state to down
*Dec 26 08:47:01.019: %LINEPROTO-5-UPDOWN: Line protocol on Interface TenGigabitEthernet1/1/7, changed state to down
*Dec 26 08:47:01.019: %LINEPROTO-5-UPDOWN: Line protocol on Interface TenGigabitEthernet1/1/8, changed state to down
*Dec 26 08:47:01.019: %LINEPROTO-5-UPDOWN: Line protocol on Interface FortyGigabitEthernet1/1/1, changed state to down
*Dec 26 08:47:01.019: %LINEPROTO-5-UPDOWN: Line protocol on Interface FortyGigabitEthernet1/1/2, changed state to down
*Dec 26 08:47:03.862: %PNP-6-PNP_DISCOVERY_STOPPED: PnP Discovery stopped (Startup Config Present)
*Dec 26 08:47:23.121: %PLATFORM_PM-6-FRULINK_INSERTED: 8x10G uplink module inserted in the switch 1 slot 1
Switch#
Switch#

Thanks

Leo Laohoo
Hall of Fame
Hall of Fame
What is the exact model of this switch?

Hi Leo,

This is the part number "C9300-48P-E".

 

Thanks

WOLFGANG MEHLER
Level 1
Level 1

Hi Steev112,

Cisco 25GBASE SFP28 Modules C9300-NM-2Y is earliest supported within

IOS XE Fuji 16.9.1

Regards,

Wolfgang

Getting Started

Find answers to your questions by entering keywords or phrases in the Search bar above. New here? Use these resources to familiarize yourself with the community:

Review Cisco Networking products for a $25 gift card