Hi,
Need help with network planning here.
Our servers are hosted at the Main site, site office A access to the Main site for Internet and servers.
We are thinking NextG to take over when the link between sites goes down.
To start with, can anyone please advise the configuration for 3750 at Site A and the Main site:
1) Trunking for both switches
2) Routing
3) the automatic failover configuration for the switch at Site A.
Cheers,
PeiWai
