07-04-2017 12:19 AM - edited 03-08-2019 11:11 AM
Hi all,
I have to add a new catalyst 3650 to an older one already configured so they will be in stack mode.
My question is :
Need I configure the second switch with the same configuration of the first switch (interface switchport, routing intevlan, creation of VLAN) or just configure the stacking between the 2 switches and the configuration will be copied to the newer switch added ?
Thank you for support.
Solved! Go to Solution.
07-04-2017 12:34 AM
Hi
you want to make sure the switch in production is set as master pri 15 or the new switch could take over and reboot the stack as it forming , once its set as the master it shouldn't get wiped , make sure ios-xe versions are same on both switches to get full feature set when stacked
07-04-2017 12:34 AM
Hi
you want to make sure the switch in production is set as master pri 15 or the new switch could take over and reboot the stack as it forming , once its set as the master it shouldn't get wiped , make sure ios-xe versions are same on both switches to get full feature set when stacked
07-04-2017 02:00 AM
THank you so much Mark for advice.
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide