cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
628
Views
0
Helpful
4
Replies

Etherchannel issues

sumitn
Level 1
Level 1

Hi All,

 

In my setup, WLC  (2504) - Switch (WS-C3850-12S) are connected to each other in the production environment. LAG is enabled on WLC end and  ether-channel is created on switch end and two interfaces (Gi1/0/1 & Gi2/0/1) are part of ether channel bundle.

 

Now I am planning to add additional interface in the ether channel bundle. I am observing following error while adding third interface.

 

XXX(config-if)#channel-group 9 mode on

Command rejected: conflicts with Switch Backup Interface

 

Please note that I haven't taken any downtime window while making this change hence  I cant reboot WLC. 

 

I know that its basic requirement to reboot WLC in order to support LAG if its not previously enabled. I was wondering if WLC reboot is required since LAG has already enabled but not sure as it is not making sense :) 

 

Anyone has experienced this issue ? Appreciate if any one can help with the solution.

 

Thanks,

Sumit

 

4 Replies 4

Reza Sharifi
Hall of Fame
Hall of Fame

Hi,

The reboot is only required initially when you enable LAG.  After that, there should not be any need to reboot again as the LAG has already been enabled. Is the error on the 3850 side or WLC?

HTH

 

Hi,

 

This error is from catalyst 3850 switch.

 

Thanks

@sumitn  hello,

 

Could you share the configuration of this interface?

 

By the way, try it under interface:  no swtichport backup interface

 

 

check this link for more information: https://www.cisco.com/c/en/us/td/docs/switches/lan/catalyst3850/software/release/3se/layer2/configuration_guide/b_lay2_3se_3850_cg/b_lay2_3se_3850_cg_chapter_0110.html

Jaderson Pessoa
*** Rate All Helpful Responses ***

Hi,

Can you first showdown the new interface on both sides and then try adding it to the PO? Finally, un-shut the interface.

HTH

Review Cisco Networking products for a $25 gift card