cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
589
Views
0
Helpful
2
Replies

Failover time testing for Cisco 4506-E VSS Pair

Waqas Ali Khan
Level 1
Level 1

We have catalyst cisco 4506-E configured as a VSS Pair. I have to to do failover testing last week. In testing, I noticed the following thing:

 

  • When I do failover from switch 1 (primary) to switch 2 (secondary) it takes 10 minutes that secondary switch takes the active role, while when I do the vice versa it takes only one second.

 

Could you guys, please advise why I got this behavior?

2 Replies 2

Leo Laohoo
Hall of Fame
Hall of Fame
Could be an IOS bug.
How did you do the "failover"? Did you power down the chassis? Did you pull the supervisor card?

No, I used the redundancy force-switchover command. Earlier I am using IOS XE 3.6.6 now I am using IOS XE 3.8.7.

Review Cisco Networking for a $25 gift card