Hi experts
I need your input on to best move Sup modules from 6509 to 6513 and preserve the VSS configurations.
Basically I'm upgrading 6513s which are the core of my production network. 6509s are in lab, so I install SUPs on 6509 and configured them and tested.
Now I need to move them to 6513s, without repeating all the work, most importally to minimise the down time. the lab configuration is identical to production; line cares are the same, execpt slot numbers are different which will affect port numbers.
I really appreciate your input.
thank you.