Hi Guys
We are trying to setup our second floor with redundant Internet links as shown on the graph below. We have 2 cables from Floor 1 to Floor 2 my initial idea is to hook them and playing with STP priority ... any better ideas are greatly appreciated!
Thanks!
Chris
Solved! Go to Solution.
05-10-2019 09:59 PM
@Reza Sharifi Thanks Reza! I think we are on the same page, I will test and post later!
06-26-2019 04:15 PM
Hi Reza
Quick question - my NXOS1 and NXOS2 are VPC providers and they are connected between themselves with peer-link etc, the same is valid for my other pair of switches NXOS4 and NXOS5 are VPC providers. So can I count on STP in that scenario for the links between the switch pairs?
05-10-2019 01:21 PM
Is there a specific reason you can't use another vPC between the 2 sets? If any of the 4 switches went down, or one of the links, everything would use the other link.
05-10-2019 09:56 PM
Hi Danjmcintyre
No there is no reason, I wasn't aware you can have VPC in this setup, is that actually possible please confirm!
05-11-2019 12:41 AM - edited 05-11-2019 12:59 AM
yes vPC possible, please refer the document which was reffered before.
if you have enough ports and fibre leads good to have setup as mentioned for fully redundant.
05-14-2019 07:19 AM
Hi Balaji
Can you please confirm! This is the correct setup - I have only 2 cables from floor 1 to floor 2 and there is no additional connections allowed/possible between both floors.
05-14-2019 09:22 AM
I was suggesting 4 cables from Floor 1 to Floor 2, it is good to have 4 cables as a best design.
if not you can use 2 cables to Straght to uplink switch rather cross ( Cross can also be done, but it is easy for your design wise.
05-14-2019 11:50 AM
Hi Balaji
In our case we have only 2 cables and we cannot add more. Can we go VPC between the floors or we simply hook them and play with STP priorities?
05-14-2019 01:02 PM
Both is possiblem depends in requirement, if vPC availble i prefer with vPC. so you can utilise the links 100%
05-15-2019 09:33 AM
05-15-2019 10:23 AM
I don't see how that is valid. See figure 9 in this link. This is your design. It requires 4 links.
HTH
05-15-2019 12:13 PM
@Reza Sharifi thanks Reza that's what I thought but i was just trying to understand Balaji @balaji.bandi
I'm just going to do what you recommended - trunks and STP priorities on NXOS1 and NXOS2 - STP priority is actually already setup on these switches as you recommended!
Thanks!
Chris
05-15-2019 03:48 PM
But i have suggested vPC with picture modifies, also commented as below - this means, where possible you can implement vPC, where not possible you go traditional way - looks like this message gone in wrong way i was guessing..
"Both is possiblem depends in requirement, if vPC availble i prefer with vPC. so you can utilise the links 100%"