Replace Member Switch that is part of a Stack

aconticisco
Level 2
Level 2

Hi,

Do I need to configure anything on the replacement switch if it is the same model and running same IOS version?

I ran "show switch" on it and it stats that it is Switch 5 so not sure how it got this right as the faulty Switch was indeed member 5.

 

So now I just need to confirm if anything needs to be configured on this Switch or if I can just go ahead and power it off and connect the StackWise Connectors.

 

What should I monitor after powering back on, any useful commands?

 

Thanks

 

1 Accepted Solution

Accepted Solutions

balaji.bandi
Hall of Fame
Hall of Fame

Power down old switch and remove from stack

 

Offline prepare the switch :

- New switch load same IOS and feature set as exiting stack members

- New switch change switch member number and priority  to the old switch member number and priority

- save the config and power down new switch

 

bringing to Live

 - connect the cable new switch to Live stack via stack wise cabling and power new switch up

 

 

useful commands :

 

show switch  - will give once this is provisioning.

show switch stack-ports

show switch stack-ring speed

 

BB

***** Rate All Helpful Responses *****

How to Ask The Cisco Community for Help

View solution in original post

5 Replies 5

balaji.bandi
Hall of Fame
Hall of Fame

Power down old switch and remove from stack

 

Offline prepare the switch :

- New switch load same IOS and feature set as exiting stack members

- New switch change switch member number and priority  to the old switch member number and priority

- save the config and power down new switch

 

bringing to Live

 - connect the cable new switch to Live stack via stack wise cabling and power new switch up

 

 

useful commands :

 

show switch  - will give once this is provisioning.

show switch stack-ports

show switch stack-ring speed

 

BB

***** Rate All Helpful Responses *****

How to Ask The Cisco Community for Help

Hi BB,

 

Replacement Switch already shows the following out of the box when show switch command is entered:

 

*5   Active   xxxx.xxxx.xxxxx   11  Vxx  Ready

 

This matches the faulty switch in terms of Member Number and Priority. Current Master and Slave have higher priority.

 

So in this case I can simply power it OFF, connect StackWise Cables and power back ON

 

In case there was a mismatch with the Member Number and/or Priority I would need to specify them to match old faulty Switch and copy run start to save.

 

Hope the above makes sense and thank you for the additional commands

 

 

 

 

This is a standalone switch you want to join to exiting stack is this correct? priority 11 set by you?

 

Can you post Live stack? 

 

 

show switch  - will give once this is provisioning.

show switch stack-ports

show switch stack-ring speed

 

see the priority list (we do not want to assume something there)  if the other master has higher priority before connecting this one.

 

 

BB

***** Rate All Helpful Responses *****

How to Ask The Cisco Community for Help

Joseph W. Doherty
Hall of Fame
Hall of Fame

What model switches?

Review Cisco Networking products for a $25 gift card