Replacing Member 3750 switch

BHconsultants88
Level 1
Level 1

Hi everyone, I'm sure this will be a very simple question for you guys. Member switch of my stack pair failed last week and I'm keen to replace it asap.

 

Cisco 3750-48

Switch 1 failed

Switch 2 master

 

To replace switch 1, I have another 3750 with blank configuration. I've installed the same IOS as the master. What command should I use to make sure it doesn't attempt to become the master when connecting it to switch 2?

 

Thanks in advance

2 Replies 2

Leo Laohoo
Hall of Fame
Hall of Fame
You don't.
Make sure the replacement switch is POWERED OFF before connecting the stacking cable.
Once the stacking cables are secured then apply power to the replacement switch.
Once the replacement switch joins the stack, don't forget to configure the switch priority of the new replacement switch.

omz
VIP Alumni
VIP Alumni

Hi,  

If you have matching IOS on the replacement switch as the master switch. Poweroff the replacement switch, connect stack cables and power up. The switch will boot and join the stack.

Use 'show switch' to check current master priority. Higher value wins.

"What command should I use to make sure it doesn't attempt to become the master when connecting it to switch 2?" Set priority on the replacement switch lower than the current stack master.

Tips to Add a Switch as a Slave to the Stack

To add a switch, as a slave, to a stack, complete these steps:

Note: Make sure the switch that you add into the stack has the same IOS version as the switches in the stack. Refer to to upgrade the IOS in a catalyst 3750 switch.

  1. Change the switch priority of the switch to be added to "1".

    switch stack-member-number priority new-priority-value

    Note: This step is optional, but it will make sure that the switch has fewer chances to become a stackmaster in the future.

  2. Power off the switch that is to be added.

  3. Make sure that the stack is fully connected so that, when you connect the new switch, the stack will be at least in half connectivity and does not partition.

  4. Connect the new switch to the stack with the StackWise ports.

  5. Power on the newly added switch.

  6. After the new switch comes up, issue the command show switch to verify stack membership.