ā09-13-2021 04:10 AM
Dear guys,
I have 3 Catalyst 2960S-24PS-L in a stack, which are Power back-upped by a RPS 2300 Unit. I needed to replace the APC and therefore i need to switch the internal power of the switches to the new APC. I've done this for 2 of the switches in stack already and the RPS2300 did do his job. However I now connected the switches back on the new APC and the Switches remain on RPS.
I read about a needed reload since i don't have an e-serie switch.
I have scheduled the reload this weekend but the switches still remain on the RPS.
RPS Led on the switches blinking amber for these 2 switches, the 3th switch is blinking green but that's expected behavior since the RPS is already providing power to the other 2 switches.
DC output on the RPS switches:
the leds of the 2 switches are blinking green, and 1 static amber (expected behavior)
So my question how to get the switches on the internal power again? Since the reload didn't fixed it?
Thanks in advance
Solved! Go to Solution.
ā09-13-2021 04:23 AM
If you remove the Power internal PSU, this will feed get from RPS
Attached some FAQ for reference.
ā09-13-2021 04:23 AM
If you remove the Power internal PSU, this will feed get from RPS
Attached some FAQ for reference.
ā09-13-2021 04:33 AM
Great i was thinking way to difficult. thanks
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide